Uncompleted wells, equipment, and facilities costs
- Uncompleted wells, equipment, and facilities costs
The costs incurred to (1) drill and equip wells that are not yet completed, and (2) acquire or construct equipment and facilities that are not yet completed and installed.
U.S. Dept. of Energy, Energy Information Administration's Energy Glossary
Energy terms .
2014.
Look at other dictionaries:
Bolivia — Bolivian, adj., n. /beuh liv ee euh, boh /; Sp. /baw lee vyah/, n. 1. a republic in W South America. 7,669,868; 404,388 sq. mi. (1,047,370 sq. km). Caps.: La Paz and Sucre. 2. (often l.c.) a twill fabric made of cut pile with lines either in the… … Universalium
Chesham branch — The sharply curved embankment into Chesham station and the entrance to the disused second platform Overview … Wikipedia